I 15 FRONTAGE RD over BOULDER RIVER 042
BASIN · County 043, Montana · Built 1985 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
46.269308, -112.266025
This bridge is in worse condition than 19.9% of bridges in County 043. The average bridge in Montana is 0 years old; this one is 41 years old.
Nearby Bridges
I 15 over BOULDER RIVER
Built 1985
BASIN ST over BASIN CREEK 040
Built 1931
I 15 over SEP SILVER AVE-BASIN CR
Built 1985
I 15 FRONTAGE RD over BASIN CREEK 041
Built 1985
BASIN CREEK RD over BASIN CREEK 032
Built 1960
I 15 over BOULDER RIVER
Built 1985
I 15 over INT BASIN
Built 1985
I 15 over BOULDER RIVER
Built 1985
I 15 FRONTAGE RD over BOULDER RIVER 043
Built 1985
I 15 over BOULDER RIVER
Built 1985
Bridge Details
- Structure #
- L22099009+02001
- Year Built
- 1985
- Length
- 32.3 m (106 ft)
- Max Span
- 32 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.