I 15 over SEP RR

1.2M N MONIDA · County 001, Montana · Built 2015 · 2 Lanes · 1,771 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I00015001+05691
Year Built
2015
Length
119.8 m (393 ft)
Max Span
49.7 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
1,771
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.