I 15 NBL over HUMPHREY ROAD IC
AT HUMPHREY · County 033, Idaho · Built 1966 · 2 Lanes · 1,750 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
44.487386, -112.235422
This bridge is in worse condition than 69.2% of bridges in County 033. The average bridge in Idaho is 0 years old; this one is 60 years old.
Nearby Bridges
I 15 SBL over HUMPHREY ROAD IC
Built 1991
I 15 over FRONTAGE ROAD GS
Built 1969
OLD HWY 91 over PLEASANT VALLEY CREEK
Built 1934
OLD HWY 91 over UPRR;N.SPENCER RR OP
Built 1936
I 15 SBL over CO.RD.;STODDARD CREEK IC
Built 1969
I 15 NBL over CO.RD.;STODDARD CREEK IC
Built 1969
W. CAMAS CREEK RD over BEAVER CREEK
Built 1970
I 15 over INT MONIDA S 509
Built 1981
I 15 over INT MONIDA S 509
Built 1959
I 15 over BEAVER CREEK
Built 1969
Bridge Details
- Structure #
- 000000000011985
- Year Built
- 1966
- Length
- 34.7 m (113.8 ft)
- Max Span
- 11.3 m
- Width
- 16 m (52.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,750
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $127,000
- Total Project Cost
- $191,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.