S 248 over Spring Creek
2 M west of Four Buttes · County 019, Montana · Built 2023 · 2 Lanes · 392 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
48.809444, -105.646281
This bridge is in worse condition than 18.2% of bridges in County 019. The average bridge in Montana is 0 years old; this one is 3 years old.
Nearby Bridges
S248 over Drainage
Built 2024
N FOUR BUTTES RD over BUTTE CREEK 012
Built 2017
S 248 over BUTTE CREEK
Built 2023
S 248 over Drainage
Built 2023
S 248 over POPLAR RIVER
Built 1940
S 248 over DRAINAGE
Built 2007
FRENCH LN over POPLAR RIVER OVERFLO 015
Built 1978
FRENCH LN over POPLAR RIVER 009
Built 2003
OLD SCOBEY RD over POPLAR RIVER
Built 2021
Bridge Details
- Structure #
- 000000202406485
- Year Built
- 2023
- Length
- 24.5 m (80.4 ft)
- Max Span
- 24.2 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 392
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.