S 248 over BUTTE CREEK
3M W SCOBEY · County 019, Montana · Built 2023 · 2 Lanes · 392 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
48.800417, -105.494611
This bridge is in worse condition than 18.2% of bridges in County 019. The average bridge in Montana is 0 years old; this one is 3 years old.
Nearby Bridges
S 248 over Drainage
Built 2023
S 248 over POPLAR RIVER
Built 1940
S 248 over DRAINAGE
Built 2007
OLD SCOBEY RD over POPLAR RIVER
Built 2021
FRENCH LN over POPLAR RIVER 009
Built 2003
FRENCH LN over POPLAR RIVER OVERFLO 015
Built 1978
S 13 over EAST FORK POPLAR RIVER
Built 1957
IRR - S 13 over MANTERNACH COULEE
Built 1988
N FOUR BUTTES RD over BUTTE CREEK 012
Built 2017
S248 over Drainage
Built 2024
Bridge Details
- Structure #
- 000000202306487
- Year Built
- 2023
- Length
- 45.3 m (148.6 ft)
- Max Span
- 15.2 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 392
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.