IRR BIA RTE 7 over POPLAR RIVER

2 KM S OF POPLAR · County 085, Montana · Built 2002 · 2 Lanes · 481 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000000C622
Year Built
2002
Length
77.6 m (254.6 ft)
Max Span
38.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
481
Material
Prestressed Concrete
Design
Tee Beam
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.