TUCKER BLVD N over IS 55 IS 44

S 27 T 45 N R 7 E · County 510, Missouri · Built 1965 · 6 Lanes · 13,991 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
894
Year Built
1965
Reconstructed
1985
Length
100 m (328.1 ft)
Max Span
20.4 m
Width
28.6 m (93.8 ft)
Lanes
6
Daily Traffic
13,991
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,846,000
Total Project Cost
$5,769,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.