MO 30 E over IS 55 IS 55

S 27 T 45 N R 7 E · County 510, Missouri · Built 1965 · 6 Lanes · 15,557 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
891
Year Built
1965
Reconstructed
1985
Length
78.9 m (258.9 ft)
Max Span
28.4 m
Width
26.7 m (87.6 ft)
Lanes
6
Daily Traffic
15,557
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,137,000
Total Project Cost
$4,706,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.