RT P E over BR PERUQUE CR

S 11 T 47 N R 2 E · County 183, Missouri · Built 1956 · 2 Lanes · 2,295 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
7962
Year Built
1956
Length
12.5 m (41 ft)
Max Span
3 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
2,295
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$204,000
Total Project Cost
$306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.