DEER CR DR over PERUQUE CR

S 19 T 47 N R 3 E · County 183, Missouri · Built 2016 · 2 Lanes · 600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
35808
Year Built
2016
Length
228.6 m (750 ft)
Max Span
39.6 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.