MO 80 E over MAIN DRAIN DTCH #1

S 29 T 25 N R 15 E · County 143, Missouri · Built 1948 · 2 Lanes · 3,547 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
6146
Year Built
1948
Length
19.8 m (65 ft)
Max Span
7.6 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
3,547
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$570,000
Total Project Cost
$854,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.