RT B S over DRAIN DTCH #10

S 17 T 25 N R 15 E · County 133, Missouri · Built 1929 · 2 Lanes · 1,318 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
5259
Year Built
1929
Length
25.6 m (84 ft)
Max Span
12.9 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
1,318
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$667,000
Total Project Cost
$1,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.