US 63 S over PINEY RVR

S 6 T 28 N R 10 W · County 215, Missouri · Built 1941 · 2 Lanes · 5,664 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
6020
Year Built
1941
Length
80.2 m (263.1 ft)
Max Span
16 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
5,664
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,404,000
Total Project Cost
$2,106,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.