SUMMIT ST over TRIB OF PINEY RVR

S 12 T 28 N R 11 W · County 215, Missouri · Built 1990 · 2 Lanes · 100 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
35716
Year Built
1990
Length
9.1 m (29.9 ft)
Max Span
1.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.