US 67 S over NEELYVILLE DRAIN D

S 9 T 22 N R 5 E · County 023, Missouri · Built 1941 · 2 Lanes · 7,121 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
6013
Year Built
1941
Length
18.6 m (61 ft)
Max Span
6.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
7,121
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$595,000
Total Project Cost
$892,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.