US 67 S over HART DRAIN DTCH

S 3 T 22 N R 5 E · County 023, Missouri · Built 1941 · 2 Lanes · 7,121 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
6012
Year Built
1941
Length
24.1 m (79.1 ft)
Max Span
8.1 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
7,121
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$756,000
Total Project Cost
$1,134,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.