MO 43 S over CPKC RR JOPLIN CR

S 2 T 27 N R 33 W · County 097, Missouri · Built 1934 · 4 Lanes · 11,817 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
5801
Year Built
1934
Reconstructed
1987
Length
112.8 m (370.1 ft)
Max Span
13.2 m
Width
16.8 m (55.1 ft)
Lanes
4
Daily Traffic
11,817
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,240,000
Total Project Cost
$6,359,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.