MO 43 S over TURKEY CR
S 35 T 28 N R 33 W · County 097, Missouri · Built 1934 · 4 Lanes · 11,817 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
37.109403, -94.511917
This bridge is in worse condition than 89.6% of bridges in County 097. The average bridge in Missouri is 0 years old; this one is 92 years old.
Nearby Bridges
W ZORA ST E over CPKC RR
Built 2012
E ZORA ST E over MO 43 RP MO43N TO CST
Built 2012
MURPHY BLVD over JOPLIN CR
Built 2000
RP CST ZORA ST TO over DRAIN DTCH
Built 2012
SOCCER FIELD LN over JOPLIN CR
Built 2000
MO 43 S over CPKC RR JOPLIN CR
Built 1934
LONE ELM RD over TURKEY CR
Built 1955
W NORTHRIDGE TER over LONE ELM HOLLOW
Built 1998
MURPHY BLVD over LONE ELM HOLLOW
Built 2022
ST. LOUIS AVE over TURKEY CR
Built 1980
Bridge Details
- Structure #
- 5356
- Year Built
- 1934
- Reconstructed
- 1987
- Length
- 36 m (118.1 ft)
- Max Span
- 15.9 m
- Width
- 17.6 m (57.7 ft)
- Lanes
- 4
- Daily Traffic
- 11,817
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,569,000
- Total Project Cost
- $2,353,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.