MO 7 S over CHERRY CR

S 29 T 43 N R 28 W · County 083, Missouri · Built 1932 · 4 Lanes · 16,029 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
5656
Year Built
1932
Reconstructed
1991
Length
6.4 m (21 ft)
Max Span
3 m
Lanes
4
Daily Traffic
16,029
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.