NW 700 RD over CRK

S 33 T 43 N R 28 W · County 083, Missouri · Built 2023 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 8 Very Good
Substructure 8 Very Good

Location

38.464828, -94.016656

This bridge is in worse condition than 15.8% of bridges in County 083. The average bridge in Missouri is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
37081
Year Built
2023
Length
7.6 m (24.9 ft)
Max Span
7.6 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.