BU 65 S over TURKEY CR

S 9 T 22 N R 21 W · County 213, Missouri · Built 1937 · 2 Lanes · 9,427 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5518
Year Built
1937
Reconstructed
1986
Length
80.2 m (263.1 ft)
Max Span
16 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
9,427
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,284,000
Total Project Cost
$1,925,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.