BU 65 S over CST DOWNING ST CST OL

S 9 T 22 N R 22 W · County 213, Missouri · Built 1937 · 2 Lanes · 9,427 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
5493
Year Built
1937
Reconstructed
1986
Length
60.4 m (198.2 ft)
Max Span
13 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
9,427
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,491,000
Total Project Cost
$2,236,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.