BU 60 E over HICKORY CR

S 18 T 25 N R 31 W · County 145, Missouri · Built 1931 · 2 Lanes · 4,427 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5458
Year Built
1931
Length
34.4 m (112.9 ft)
Max Span
11.4 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
4,427
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$671,000
Total Project Cost
$1,007,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.