MO 86 E over W HIGH SCHOOL BR

S 24 T 25 N R 32 W · County 145, Missouri · Built 1900 · 3 Lanes · 8,224 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
4635
Year Built
1900
Reconstructed
1993
Length
10.8 m (35.4 ft)
Max Span
3.7 m
Lanes
3
Daily Traffic
8,224
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000
Total Project Cost
$450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.