US 61 S over UP RR

S 270 T 38 N R 9 E · County 186, Missouri · Built 1930 · 2 Lanes · 5,235 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
5267
Year Built
1930
Reconstructed
1981
Length
33.2 m (108.9 ft)
Max Span
11.8 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
5,235
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$600,000
Total Project Cost
$901,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.