US 61 S over GABOURI CR

S 24 T 38 N R 8 E · County 186, Missouri · Built 1929 · 2 Lanes · 5,235 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
5230
Year Built
1929
Reconstructed
1940
Length
22.9 m (75.1 ft)
Max Span
11.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
5,235
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$653,000
Total Project Cost
$979,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.