US 60 E over LATERAL DRAIN DTCH

S 7 T 25 N R 10 E · County 207, Missouri · Built 1995 · 2 Lanes · 6,633 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
4360
Year Built
1995
Length
14.3 m (46.9 ft)
Max Span
4.6 m
Lanes
2
Daily Traffic
6,633
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.