US 60 W over UP RR

S 12 T 25 N R 10 E · County 207, Missouri · Built 1960 · 2 Lanes · 6,707 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
23
Year Built
1960
Reconstructed
2012
Length
63.4 m (208 ft)
Max Span
23.5 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
6,707
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,008,000
Total Project Cost
$1,512,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.