US 169 N over CST HARLEM RD

S 26 T 50 N R 33 W · County 047, Missouri · Built 1955 · 2 Lanes · 20,786 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
3806
Year Built
1955
Length
17.1 m (56.1 ft)
Max Span
17.1 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
20,786
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$328,000
Total Project Cost
$491,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.