BRDWY-WOODSWETHER over BNSF RR
S 31 T 50 N R 33 W · County 095, Missouri · Built 1951 · 2 Lanes · 105 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
39.10985, -94.588531
This bridge is in worse condition than 79.9% of bridges in County 095. The average bridge in Missouri is 0 years old; this one is 75 years old.
Nearby Bridges
WOODSWETHER RD over BNSF RR
Built 1951
WOODSWETHER RD over UP RR
Built 1951
RP IS35N TO US169N over CST W 5TH ST IS 35 U
Built 2022
US 169 S over CST WOODSWETHER RD MI
Built 2022
US 169 N over CST WOODSWETHER RD CS
Built 2021
US 169 N over MISSOURI RVR UPRR
Built 2021
US 169 S over CST W 3RD ST BNSF RR
Built 2021
RP US169S TO IS35S over CST W 5TH ST IS 70 U
Built 2022
BROADWAY BLVD S over IS 35
Built 1954
IS 35 S over IS 70 US 169 CST W 6
Built 2021
Bridge Details
- Structure #
- 25394
- Year Built
- 1951
- Reconstructed
- 1985
- Length
- 49.7 m (163.1 ft)
- Max Span
- 18.3 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 105
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $496,000
- Total Project Cost
- $743,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.