RT A S over THAYER NORTH SUB

S 25 T 29 N R 18 W · County 225, Missouri · Built 2025 · 2 Lanes · 2,868 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
37509
Year Built
2025
Length
40.4 m (132.5 ft)
Max Span
39.3 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
2,868
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.