GENTRY RD over BR OF JAMES RVR

S 17 T 29 N R 17 W · County 225, Missouri · Built 1998 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
23358
Year Built
1998
Length
28 m (91.9 ft)
Max Span
5.1 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
100
Material
Concrete Continuous
Design
Slab
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.