IS 55 S over CST CENTRAL AVE

S 416 T 40 N R 6 E · County 099, Missouri · Built 2024 · 8 Lanes · 70,419 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
37280
Year Built
2024
Length
25.5 m (83.7 ft)
Max Span
24.4 m
Width
33.7 m (110.6 ft)
Lanes
8
Daily Traffic
70,419
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.