IS 55 S over CST FIFTH ST BNSF RR
S 416 T 40 N R 6 E · County 099, Missouri · Built 2011 · 4 Lanes · 70,419 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
38.224783, -90.405356
This bridge is in worse condition than 28.8% of bridges in County 099. The average bridge in Missouri is 0 years old; this one is 15 years old.
Nearby Bridges
IS 55 N over CST CENTRAL AVE
Built 1966
IS 55 S over CST CENTRAL AVE
Built 2024
IS 55 N over CST THIRD ST
Built 1966
IS 55 S over CST THIRD ST
Built 2024
WEST MAIN ST E over IS 55
Built 1966
W MAIN ST over TRIB OF PLATTIN CR
Built 2007
OLD HWY A over JOACHIM CR
Built 2003
S 3RD @ BRIERTON over TRIB OF PLATTIN CR
Built 2022
S. MILL ST over TRIB OF PLATTIN CR
Built 1996
US 61 S over BR OF PLATTIN CR
Built 1931
Bridge Details
- Structure #
- 33516
- Year Built
- 2011
- Length
- 85.8 m (281.5 ft)
- Max Span
- 34.7 m
- Width
- 30.1 m (98.8 ft)
- Lanes
- 4
- Daily Traffic
- 70,419
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,270,000
- Total Project Cost
- $3,405,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.