LAGUNA PALMA RD over BOYD BRANCH
S 25 T 39 N R 5 E · County 099, Missouri · Built 2023 · 2 Lanes · 200 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
38.059678, -90.424167
This bridge is in worse condition than 26.3% of bridges in County 099. The average bridge in Missouri is 0 years old; this one is 3 years old.
Nearby Bridges
BOYD BRANCH RD over BIG SPRING HOLLOW
Built 1986
CHARTER CHURCH RD over PLATTIN CR
Built 2020
CHARTER CHURCH RD over TRIB TO PLATTIN CR
Built 2010
LAGUNA PALMA RD over N FK LK LAGUNA PAL
Built 1986
FRAZIER RD over TRIB OF BOYD BR
Built 1970
BOYD BRANCH RD over BOYD CR
Built 1940
CHARTER CHURCH RD over TRIB OF PLATTIN CR
Built 1900
CHARTER CHURCH RD over TRIB OF FLUCOM BR
Built 1984
RT T E over DRY FK CR
Built 2000
RT T E over PLATTIN CR
Built 2000
Bridge Details
- Structure #
- 37018
- Year Built
- 2023
- Length
- 32 m (105 ft)
- Max Span
- 30.5 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.