RT T E over DRY FK CR
S 17 T 39 N R 6 E · County 099, Missouri · Built 2000 · 2 Lanes · 434 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
38.087981, -90.387161
This bridge is in worse condition than 52.7% of bridges in County 099. The average bridge in Missouri is 0 years old; this one is 26 years old.
Nearby Bridges
RT T E over PLATTIN CR
Built 2000
DOSS HOLLOW RD over TRIB TO PLATTIN CR
Built 2022
BROOKSTONE RD over TRIB OF DRY FORK
Built 1997
FRAZIER RD over TRIB OF BOYD BR
Built 1970
CHARTER CHURCH RD over PLATTIN CR
Built 2018
CHARTER CHURCH RD over TRIB OF FLUCOM BR
Built 1984
CHARTER CHURCH RD over TRIB TO PLATTIN CR
Built 2010
CHARTER CHURCH RD over PLATTIN CR
Built 2020
CHARTER CHURCH RD over TRIB OF PLATTIN CR
Built 1900
HARNESS RD over HOCUM HOLLOW CR
Built 1900
Bridge Details
- Structure #
- 11928
- Year Built
- 2000
- Length
- 8.6 m (28.2 ft)
- Max Span
- 2.7 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 434
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.