BU 63 S over TWO MILE CR BNSF RR

S 30 T 22 N R 5 W · County 149, Missouri · Built 2020 · 2 Lanes · 2,490 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
36362
Year Built
2020
Length
98.3 m (322.5 ft)
Max Span
29 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
2,490
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.