US 63 S over WARM FORK

S 32 T 22 N R 5 W · County 149, Missouri · Built 1966 · 2 Lanes · 8,005 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
1220
Year Built
1966
Length
110.9 m (363.8 ft)
Max Span
31.1 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
8,005
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.