DAVID HOEKEL PKWY over IS 70 IS 70

S 28 T 47 N R 1 E · County 183, Missouri · Built 2019 · 4 Lanes · 4,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
36159
Year Built
2019
Length
38.2 m (125.3 ft)
Max Span
37.2 m
Width
19.6 m (64.3 ft)
Lanes
4
Daily Traffic
4,000
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.