DAVID HOEKEL PKWY over OR 70 NS RR

S 28 T 47 N R 1 E · County 183, Missouri · Built 2019 · 4 Lanes · 4,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
36157
Year Built
2019
Length
64.4 m (211.3 ft)
Max Span
25.3 m
Width
35.1 m (115.2 ft)
Lanes
4
Daily Traffic
4,000
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.