RT B E over MISSION BR
S 5 T 38 N R 30 W · County 013, Missouri · Built 2016 · 2 Lanes · 644 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 9 | Excellent |
Location
38.094175, -94.244456
This bridge is in worse condition than 17.2% of bridges in County 013. The average bridge in Missouri is 0 years old; this one is 10 years old.
Nearby Bridges
RT N S over SYCAMORE BR
Built 1957
RT B E over SYCAMORE BR
Built 1957
7586 over SYCAMORE BR
Built 1992
7305 over BR OF MISSION CR
Built 1993
7336 over MISSION CR
Built 1950
RT B E over MARAIS DES CYGNES
Built 2023
SE 7305 over MISSION CR
Built 2019
10236 over MARAIS DES CYGNES
Built 1995
6575 over CO DRAIN DTCH
Built 1997
10006 over MUDDY CR
Built 1925
Bridge Details
- Structure #
- 34870
- Year Built
- 2016
- Length
- 25.6 m (84 ft)
- Max Span
- 9.8 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 644
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.