7336 over MISSION CR
S 34 T 39 N R 30 W · County 013, Missouri · Built 1950 · 1 Lanes · 15 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.111817, -94.220297
This bridge is in worse condition than 66.6% of bridges in County 013. The average bridge in Missouri is 0 years old; this one is 76 years old.
Nearby Bridges
SE 7305 over MISSION CR
Built 2019
7305 over BR OF MISSION CR
Built 1993
7586 over WILLOW CR
Built 1930
7586 over SYCAMORE BR
Built 1992
SE 6576 over WILLOW CR
Built 2009
SE 6576 over TRIB OF SHAW BR
Built 1992
5576 over MISSION BR
Built 1987
RT B E over MISSION BR
Built 2016
5576 over WILLOW CR
Built 1988
RT N S over SYCAMORE BR
Built 1957
Bridge Details
- Structure #
- 25068
- Year Built
- 1950
- Length
- 8.2 m (26.9 ft)
- Max Span
- 8.2 m
- Width
- 4.7 m (15.4 ft)
- Lanes
- 1
- Daily Traffic
- 15
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $181,000
- Total Project Cost
- $272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.