MO 48 E over ONE HUNDRED AND TW

S 34 T 61 N R 35 W · County 003, Missouri · Built 2014 · 2 Lanes · 1,066 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
34555
Year Built
2014
Length
116.9 m (383.5 ft)
Max Span
30.5 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
1,066
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.