COUNTY RD 125 over LOWER NEELY CR

S 24 T 61 N R 35 W · County 003, Missouri · Built 2010 · 2 Lanes · 35 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
33034
Year Built
2010
Length
37.3 m (122.4 ft)
Max Span
12.2 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
35
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.