LONE PINE WAY over DRAINAGE DTCH
S 2 T 63 N R 14 W · County 001, Missouri · Built 2011 · 1 Lanes · 35 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.291361, -92.440394
This bridge is in worse condition than 70.8% of bridges in County 001. The average bridge in Missouri is 0 years old; this one is 15 years old.
Nearby Bridges
LONE PINE WAY over BR OF S FK S FABIU
Built 2011
APACHE WAY over BR OF S FK FABIUS
Built 1997
WILLMATHSVILLE SCH over COTTONWOOD FORK
Built 2023
HORNET WAY over COTTONWOOD FK
Built 1940
OLIVE HILL WAY over S FK S FABIUS RVR
Built 2000
LONE PINE WAY over COTTNWD FK S FK S
Built 2004
MORGAN WAY over S FORK OF S FABIUS
Built 2004
APACHE WAY over TRIB N FK S FABIUS
Built 1981
APACHE WAY over COTTNWD FK S FK S
Built 1999
CLAY WAY over BRANCH OF NORTH SA
Built 1987
Bridge Details
- Structure #
- 34242
- Year Built
- 2011
- Length
- 7.5 m (24.6 ft)
- Max Span
- 7 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 35
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $170,000
- Total Project Cost
- $255,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.