APACHE WAY over COTTNWD FK S FK S
S 34 T 64 N R 14 W · County 001, Missouri · Built 1999 · 1 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
40.312, -92.450772
This bridge is in worse condition than 86.4% of bridges in County 001. The average bridge in Missouri is 0 years old; this one is 27 years old.
Nearby Bridges
APACHE WAY over TRIB N FK S FABIUS
Built 1981
CLOVER WAY over COTTONWOOD FRK-S.F
Built 1999
MORGAN WAY over S FORK OF S FABIUS
Built 2004
APACHE WAY over BR OF S FK FABIUS
Built 1997
WILLMATHSVILLE WAY over BR OF N FK S FABIU
Built 2007
WILLMATHSVILLE WAY over BR OF N FK S FABIU
Built 2007
WILLMATHSVILLE SCH over COTTONWOOD FORK
Built 2023
HORNET WAY over COTTONWOOD FK
Built 1940
LONE PINE WAY over BR OF S FK S FABIU
Built 2011
LONE PINE WAY over DRAINAGE DTCH
Built 2011
Bridge Details
- Structure #
- 14367
- Year Built
- 1999
- Length
- 15.5 m (50.9 ft)
- Max Span
- 14.9 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $181,000
- Total Project Cost
- $272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.