MO 9 N over BNSF RR

S 23 T 50 N R 33 W · County 047, Missouri · Built 1983 · 2 Lanes · 9,469 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
3413
Year Built
1983
Length
279.8 m (918 ft)
Max Span
29 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
9,469
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,811,000
Total Project Cost
$5,717,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.