RP US65N TO US60W over RP US60W TO US65S
S 16 T 28 N R 21 W · County 077, Missouri · Built 2009 · 1 Lanes · 15,064 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
37.128136, -93.229814
This bridge is in worse condition than 85.7% of bridges in County 077. The average bridge in Missouri is 0 years old; this one is 17 years old.
Nearby Bridges
RP US60E TO US65N over RP US60W TO US65N
Built 2010
US 65 N over US 60
Built 2010
US 65 S over US 60
Built 1968
US 60 W over GALLOWAY CR BNSF RR OZ
Built 2010
US 60 E over JAMES RVR
Built 1965
RP US65N TO US60W over GALLOWAY CR BNSF RR OZ
Built 2009
US 60 E over GALLOWAY CR BNSF RR OZ
Built 2009
RP US60E TO US65N over GALLOWAY CR BNSF RR OZ
Built 2010
US 60 W over JAMES RVR
Built 2009
US 65 S over CST TIMBERCREST ST LK
Built 1975
Bridge Details
- Structure #
- 32796
- Year Built
- 2009
- Length
- 502 m (1647 ft)
- Max Span
- 48.2 m
- Width
- 10.3 m (33.8 ft)
- Lanes
- 1
- Daily Traffic
- 15,064
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,831,000
- Total Project Cost
- $10,246,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.