US 65 S over US 60

S 16 T 28 N R 21 W · County 077, Missouri · Built 1968 · 3 Lanes · 36,797 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1756
Year Built
1968
Reconstructed
2010
Length
56.1 m (184.1 ft)
Max Span
16.5 m
Width
13.4 m (44 ft)
Lanes
3
Daily Traffic
36,797
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,166,000
Total Project Cost
$1,748,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.