US 50 E over PIN OAK CR

S 16 T 43 N R 6 W · County 073, Missouri · Built 1979 · 2 Lanes · 2,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
3212
Year Built
1979
Length
57.6 m (189 ft)
Max Span
19.7 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
2,700
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.